VapeWholesaleHub  |  Wholesale supplier · Shenzhen, China
Tel / WeChat / WhatsApp: +86 13711127975  |  vape@0099933.xyz
Home  /  THC Vape  /  THC Vape claim for buyers guide
THC vape products · distributors

THC Vape claim for buyers guide

A THC vape programme only works when three numbers agree: your shelf price, your reorder cycle and your defect tolerance. Change one and the plan moves. We build assortments around those three and we say so up front rather than after the invoice.

Published 15 March 2026  ·  VapeWholesaleHub  ·  Reading time 9 min

Unit from the retained reference sample held against this order number.
Unit from the retained reference sample held against this order number.
Surface finish under raking light, one of the cosmetic checks.
Surface finish under raking light, one of the cosmetic checks.

How orders move from factory to shelf

This page is for distributors who want a working answer on specification, price and lead time before they commit a purchase order. We have written the detail down so nobody has to sit through a sales call to extract it.

Damage in transit is nearly always a packing decision, not bad luck. Double-walled cartons, internal dividers and a drop-tested configuration cost a little more and save the argument at the other end.

We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 30 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.

Building an assortment that actually turns

Most distributors arrive with a spreadsheet and leave with too many SKUs. The fix is not a bigger catalogue, it is a narrower core. We normally propose three tiers: a volume line that carries the shelf, a step-up line that lifts basket value, and one trial SKU that tells you what to order next season.

Sourcing trips still matter for volume buyers. Seeing the line, the ageing room and the packing station tells you in an hour what six emails cannot. We host visits by appointment and we do not stage them.

For distributors, the practical answer is usually a shorter range: two core lines, one step-up, one trial SKU. Everything else is inventory risk wearing a nice finish.

The checks behind every shipment

Cosmetic grading is written down, not argued about. Minor scuffs inside the tolerance band are accepted; anything that would make a customer put the unit back on the shelf is rejected. Your staff should never have to explain a finish defect to a paying customer.

11 separate checks run before a carton is sealed: electrical, mechanical, leak, finish and packaging. Anything outside tolerance is quarantined the same day and reported to you, rather than shipped with a hope and a discount.

  • Named account contact who has handled the product
  • Consolidated or split shipping, quoted both ways
  • Specification locked in writing before production starts
  • Seven-day defect reporting with replace-or-credit
  • Cartons drop-tested and pallet-counted for clean freight
  • Batch codes traceable from carton back to production date

Paperwork, labelling and market rules

Advertising rules are stricter than product rules in most markets. Claims about cessation, health or comparative performance should stay off packaging and off your product pages unless your legal team has signed them off.

Artwork approval is a two stage process: a digital proof for text and layout, then a physical dummy for colour and finish. Skipping the dummy is the single most common cause of a reprint.

Specification summary

Typical specification for this category
Volume0.5 ml
HardwareCotton core
Thread510 thread
AirflowFixed
WindowSide window
PackagingTube
Minimum order100 units per SKU, mixed cartons allowed
Lead time18 working days after artwork approval

We would rather lose an order at quotation stage than explain a mismatch after delivery, which is why the specification conversation comes before the price conversation.

Frequently asked

What happens if part of the order is defective?

Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.

What documents come with a shipment?

Commercial invoice, packing list, and the certificate pack for your market: test reports, declaration of conformity and safety data sheets. We send scans before dispatch so your broker can pre-clear the file.

How long does production take?

Around 30 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.

Related reading

Need a quotation on THC vape products?

Send destination market, target price and quantity. Same-day reply on working days.

Tel / WeChat / WhatsApp +86 13711127975  ·  vape@0099933.xyz

Talk to the supply team

Ask for a quotation on THC vape products

Tell us the market you sell into and the price band you work in. You will get a specification and a landed cost estimate, not a catalogue dump.

What to send

Destination market, target retail price, quantity per SKU, and whether you need private label. With those four lines we can quote the same day.

Samples ship by air express and the cost is credited against your first production order.

Email the team
WhatsApp Email us